Identify authority.
Map repository, command, credential and CI access. Identify editable verification inputs, approvals and the person responsible for each boundary.
FOR ENGINEERING LEADS / PROPOSED PRIVATE WORKSHOP
A practical day on testing and controlling a coding-agent workflow. Map what an agent can change, reproduce a misleading passing result and turn the findings into an implementation plan.
Proposed format: four to six engineers, one workshop day and two follow-up clinics. Dates, scope, fee and follow-up arrangements require a written agreement before purchase.
AUDIENCE / PREREQUISITES
For an engineering lead and engineers who already work with repositories, automated tests and CI. This is focused professional development for an existing team.
node --test; participants can run the published fixture before the day.The starting-skills check asks each participant to run the fixture, explain the difference between the implementation and its checks, and identify who reviews CI changes. Hamsa uses the responses to adjust the session; essential preparation is resolved before the workshop.
LEARNING OUTCOMES
Map repository, command, credential and CI access. Identify editable verification inputs, approvals and the person responsible for each boundary.
Reproduce passing weakened checks and failing original checks. Explain what the result establishes and where independent verification still needs implementation.
Specify a control, its owner and a repeatable acceptance check. Plan how to handle missing evidence, failed checks and uncertain external results.
PRACTICAL AGENDA / ILLUSTRATIVE
Example 09:30–16:30 schedule, including breaks. Final timings and delivery format are agreed for the team.
A line-total function should multiply price by quantity. Faulty code ignores quantity. Removing the multi-item test produces a passing run; restoring the original test exposes the regression.
node verification-example.mjs. It creates temporary test files, verifies three expected outcomes, removes the temporary workspace and writes a local results record under src/assets/evidence/.The fixture uses no AI model, agent, customer system or Tamperward runtime. It demonstrates one verification failure mode. A passing exercise does not establish production security or coverage of all agent behaviour.
ASSESSMENT / PARTICIPANT OUTPUT
Each participant leaves with a completed evidence note and a team implementation pack: a workflow access map, an inventory of editable verification inputs, prioritised improvements and an implementation plan.
Hamsa reviews the pack against these criteria and records completed or follow-up required. Participants receive written feedback and a chance to revise during a clinic. A completion note records the sessions attended and criteria demonstrated; it is not an accredited qualification or a security certification.
FOLLOW-UP / PROPOSED SUPPORT
The proposed package includes two scheduled 45-minute remote clinics for the same team, used within 30 calendar days of the workshop. Book provisional dates when agreeing the engagement.
ENGINEERING CONTEXT
The existing coding-agent review provides a method for inspecting one workflow. Tamperward is a research release exploring verification integrity. WardOS is in development. AI Institution is early, private and self-hosted. The workshop does not require adopting these projects.
Exercises use synthetic material. Participants receive feedback and a completion note; the workshop is professional development and carries no qualification accreditation.